Brief

What the Client Wanted

The client had an existing home on a large rural block in Maraylya and wanted to build a second custom dwelling on the same property, along with a self-contained granny flat and a split-level garage. Each structure needed to sit comfortably on the block alongside the existing home and work with the natural slope and bush setting.

Challenge

What Was Involved

Three new structures on an occupied rural property, each with its own requirements. The second dwelling needed to work alongside the existing main home without competing with it. The site had slope to manage, limited access for deliveries, and all builds needed to be coordinated to run efficiently on a property well outside the usual suburban radius.

  • Building three new structures alongside an existing main dwelling
  • Managing site access and material deliveries on a rural property
  • Working with the natural slope and drainage across the block
  • Coordinating all trades across multiple builds at once
Solution

How We Built It

We built the second dwelling from slab up, framing the home and installing weatherboard cladding across the exterior. The cladding was fitted by our team on site, with building wrap and insulation underneath for a proper weather seal. The roof was finished in Colorbond with solar panels integrated into the design. The home has covered outdoor areas running along the front and sides, connecting the interior to the surrounding property.

The granny flat was built as a separate self-contained dwelling on the same block. One bedroom, one bathroom, open-plan living, and its own alfresco area. Finished to the same standard as the new home.

The split-level garage was built with 3.8-metre ceilings, giving the client height for vehicle storage, equipment, or future fit-out.

All framing, cladding, and carpentry is being handled in-house by the B-Built crew. Electrical, plumbing, and roofing trades are coordinated on our schedule to keep the build moving without downtime between stages.

Result

Where It's At

This project is currently at lock-up stage. Framing is complete, roofing and solar are installed, and the weatherboard cladding is around 90% done across the new dwelling. The granny flat and split-level garage are progressing alongside.

We'll update this page with the finished result once the build is handed over.